TM 10-1670-298-20&Pe Enter the name of the parachute canopy manufacturer.fEnter the entire contract number specified for the parachute canopy.g Enter the name of the station and unit to which the parachute canopy Is currently assigned When aparachute is permanently transferred to another station and/or unit, the original entry will be lined outand the name of the receiving station and/or unit will be enteredh At the top of the notes page located in back of the book enter- Placed in service: (enter month andyear that the item was placed into service).2 Jump. Inspection, and Repack Data Page Beginning with the initial packing of a parachute and each time aparachute is repacked or administered a routine inspection, make the appropriate entries on the "JUMP, INSPECTION,AND REPACK DATA" page of the log record (Figure 2-8) as shown below:Figure 2-8. Log Record Entries for the Jump, Inspection, and Repack Data Page, Typical2-23
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business