TM 10-1670-298-20&P
MAINTENANCE OF THE CARGO CAPSULE, CTU-2/A
MAINTENANCE OF THE CABLE RELEASE SYSTEM (CTU-2/A)
NEED TOOL DESCRIPTIONS TO BE FURNISHED BY GOVERNMENT FOR THESE PROCEDURES AND FOR THE
MAC.
2.24
CABLE ASSEMBLY, PARACHUTE RELEASE.
This task covers:
a.
Inspect b.
Replace
INITIAL SETUP
Tools
References
Wrench, Adjustable (Item 6, Section III, Appendix B)
Paragraph 2.9
Wrench, Torque (Item 7, Section III, Appendix B)
Materials/Parts
Cable Assembly, Parachute Release (Appendix C)
INSPECT
Conduct a technical/rigger-type inspection in accordance with the instructions contained in paragraph 2.9.
2-55