TM 10-1670-298-20&P
2.25
CABLE HARNESS ASSEMBLY.
This task covers:
a.
Inspect b.
Replace
INITIAL SETUP
Tools
References
Paragraph 2.9
Materials/Parts
Cable Harness Assembly (Appendix C)
INSPECT
Conduct a technical/rigger-type inspection in accordance with the instructions contained in paragraph 2.9.
REPLACE
NOTE
When the CTU-2/A delivery capsule is activated In flight, the cable harness assembly remains attached to the bomb
rack.
a. Remove terminating shackle of harness assembly from initiator cable assembly (Figure 2-30).
2-58