TM 5-3810-207-20/TO 36C23-3-37-12Figure 61. Boom hoist clutch hydraulic cylinder, removal and installation.(2)Add hydraulic fluid to master cylinder forboom hoist clutch (LO 5-3810-207-20).(3)Bleed the boom hoist clutch hydrauliccylinder and lines (par. 133).132. Shaft Packing Glanda.Removal.Remove the shaft packing gland asinstructed on figure 62.b.Disassembly.Disassemble the shaft packinggland as illustrated on figure 63.c.Cleaning, Inspection, and Repair.(1)Clean all parts with an approved cleaningsolvent.(2)Inspect all parts for cracks, leaks,excessive wear, and other damage. Repairor replace all defective parts.d.Reassembly.Reassemble the shaft packinggland as illustrated on figure 63.e.Installation.(1)Install the shaft packing gland as illustratedon figure 62.(2)Bleed packing gland and lines (par. 133).133. Hydraulic Tubes and Fittingsa.Removal.(1)Drain lines and master cylinder.(2)Remove the hydraulic tubes and fittings asinstructed on figure 64.b.Cleaning, Inspection, and Repair.(1)Clean all parts with an approved cleaningsolvent.93
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business