40
Washer, plain
I Ball joint superior
41
Brake band assembly
2 Nut
42
Nut
3 Connecting rod
43
Washer, plain
4 Yoke pin assembly
44
Bolt, machine
5 Clevis, rod end
45
Spring
6 Pin cotter
46
Rivet
7 Pin
47
Lining, strip
8 Screw, cap
48
Band, half
9 Washer, lock
49
Band, half
10 Shaft
c. Cleaning, Inspection and Repair.
11 Bell crank
12 Bushing
(1)
Clean all parts with an approved
13 Fitting lube
cleaning solvent and dry thoroughly.
14 Shifter, yoke end
(2)
Inspect all parts for excessive wear or
15 Nut
damage. Replace or repair all defective parts.
d. Reassemble the boom hoist shaft assembly in
16 Yoke pin assembly
17 Brake release rod
the reverse of the numerical sequence as illustrated on
18 Nut
e. Installation.
19 Washer, lock
20 Screw, cap
(1)
Install the boom hoist shaft as instructed
21 Brake lever
22 Key
(2)
Install the shifting levers on the shifter
23 Nut
collar of the boom hoist clutch (TM 53810-23212).
24 Spring seat
(3)
Install the boom hoist drive chain and
25 Spring
guard (TM 5-3810-232-12).
26 Brake spring rod
(4)
Install the main drive chain and guard
27 Nut
(TM 5-3810-232-12).
28 Washer, lock
29 Screw, cap
30 Washer, plain
31 Cover
32 Bearing bracket
33 Bushing
34 Collar, hallowell
35 Shaft
38 Pin
37 Brake lever
38 Key
39 Pin
Section VIII. HORIZONTAL REVERSING SHAFT ASSEMBLY
(2) Remove the countershaft assembly (para
6-19. General
(3) Remove shifter lever shaft and remove
The horizontal reversing shaft assembly is attached to
shifter levers free of shifter collars on horizontal
the revolving frame below and to the rear of the hoist
reversing shaft clutches (TM 5-3810-232-12).
drum shaft assembly. This shaft has two beveled swing
(4) Remove
horizontal
reversing
shaft
gears which drive the vertical reversing shaft assembly in
assembly
as
instructed
on
either direction.
6-20. Crane Horizontal Reversing
a. Removal.
6-22