TM5-3810-305-10
CAUTION
DO NOT use a torque wrench for
removal purposes. Failure to
follow this procedure could cause
damage to equipment.
17. Remove 10 upperstructure mounting cap-
screws and 20 washers from inside upper-
structure, by using a 36 mm socket, two
adapters, torque multiplier, short and long ex-
tensions, breaker bar, and extension bar
(Figure 5-16). All these tools are found in
tool box (refer to Tools for Sectionalization,
page 5-45). Set mounting capscrews and
washers aside where they will not be kicked
off deck, as they will be reinstalled shortly.
R E A
R
w
F R O N
T
Location
TOOLS REQUIRED BY TOOL NUMBER
Ref
(REFER TO PAGE 5-45)
1
6
2
8
4
15
25
5
2
6
2
8
4
15
25
3
6
3
2
8
4
15
25
5
4
6
2
8
4
15
25
5
13
6
3
2
8
4
15
25
5
14
6
3
2
8
4
15
25
5
15
6
4
2
8
15
25
5
16
6
2
8
4
15
25
5
17
6
4
2
8
15
25
5
18
6
3
2
8
4
15
25
5
Figure 5-16. Tools Used for Remo al of Mou
v
nting Caps crews
5-12