TM5-3810-305-104.5.Take loose sheave (14, Figure 5-22) that wasremoved from lift arm (16) in step 13.a ofPreparation for Separating Upperstructurefrom Carrier and insert it in slack of cable.Raise sheave (14) and cable up into clevis onlift arm (16) and using sheave pin (13), installsheave (14) in place in clevis.CAUTION Make sure three sheaves andcable are in alignment withboom. Failure to follow thisprocedure could cause damage toequipment.6. Remove wedge block and raise hook block toboom head and draw cable tight. Maintaintension on cable to prevent unspooling. Thetightened cable will help support boom andupperstructure while removing remainingcapscrews.7. ShutFigure 5-22 LiftingtheUpperstructure5-16
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business