T M 5 - 3 8 1 0 - 3 0 5 - 1
0
e. Remove posts (19), (20), (21) and (22) and
six pins (23) from storage locations A, D
and E (Figures 5-26, 5-27 and 5-28). Two
pins (2) and tube (24) are located in tool
box. Connect one end of posts (19) and
(20) to ends of post (21) with two pins
(23). Swing remaining ends of posts (19)
and (20) up and attach to ears on side of
Figure 5-26 Storage Location D
Figure 5-27 Storage Location E
boom with two pins (23, Figure 5-29).
Connect one end of post (22) to center of
post (21) with pin (23); then swing other
end of post (22) up and attach to ears
underneath boom with pin (23). Attach
tube (24) to posts (21) and (20) with two
pins (2).
Figure 5-28 Storage Location A
Figure 5-29 Support for Front of Boom
5-20