TM5-3810-305-10Removing Upperstructure from Carrier3. Swing upperstructure around and lower it toTwo personnel are required onthe deck next to upperstructure,one on each side, to observe up-perstructure separation. Anotherperson is required on the groundto handle the tether rope.2. Start engine. Hold on anti-two block BY-PASS switch and slowly hoist upperstructureoff carrier. Be sure that, while it is raising, itis clearing rotary manifold and electrical col-lector ring cover. It will not be necessary toclear manifold cover by more than 1 to 2 in.(25 to51 mm). Stop hoisting at this point.ground as follows:a.Alert all personnel that theupperstructure is to be lifted offthe carrier. Keep all uninvolvedpersonnel clear of the vehiclewhile hoisting and removal aretaking place. Check all pinconnections, cable alignment andmachine bubble level before pro-ceeding with the lift. Failure tofollow this procedure could causeDEATH or serious injury.1. Remove tether rope from tool box and knotrope to boom head quick reeving pin (Figure5-24).NOTEUsing one person pushing on lift arm andmast assembly, one person guidingcounterweight end of upperstructure andone person holding the tether rope, swingupperstructure around to right side ofcarrier.Figure 5-24 AttachedTetherRope5-18
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business