TM5-3810-305-10c. Roll up hoses H-10 and H-11 and connectends together (Figure 5-14). Return themto tool box.3. Relieve pressure in extend-retract and boomhoist circuits by turning ignition switch ON,holding on anti-two block BY-PASS switchand operating extend-retract and boom hoistlevers several times in both directions untilpressure is released. Turn ignition switchOFF.4. Push the boom hoist cylinder hoses, stickingout through cutout in front of upperstructure,back inside and attach to fittings on rotarymanifold (Figure 5-19).5. Remove toggle sheave brackets (5) and at-taching links (4) from boom (Figure 5-8) asfollows:a. Remove two pins (6) and sheaves (8) fromtoggle sheave brackets (5). Stow sheaves(8) in tool box. Remove cable frombracket (5) and restow pins (6) in brackets(5).b. Remove lynch pins (7) and attaching links(4) from studs on top of boom.c. Remove cable from between ears andremove toggle sheave brackets (5).Figure 5-8 SheavesFigure 5-19 Rotary Manifold Hoses5-37
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business