• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Lube Oil Cooler Disassembly.
Figure 7. Lube Oil Cooler Assembly.

Technical Manual For Crane, Wheel Mounted, Hydraulic, Light, 7 1/2 Ton Page Navigation
  225    226    227    228    229  230  231    232    233    234    235  
img
. . .
TM 5-3810-305-23
0037
CLEANING
Clean parts IAW General Maintenance Instructions (WP 0162).
END OF TASK
INSPECTION
1.
Inspect parts IAW General Maintenance Instructions (WP 0162).
2.
Soak cooler core (Figure 6, Item 1) in cleaning solvent to remove coolant deposits. Back flush oil passages
and dry with compressed air.
3.
Inspect soldered joints for corrosion or cracks.
4.
Pressurize cooler core (Figure 6, Item 1) to 70 psi (483 kPa), submerge in water and check for leaks.
1
M2440105
Figure 6.
Lube Oil Cooler Inspection.
END OF TASK
0037-5
03/15/2011Rel(1.8)root(maintwp)wpno(M00042)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.