• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
WORK LIGHTS MAINTENANCE
Figure 1. Work Lights Maintenance.

Technical Manual For Crane, Wheel Mounted, Hydraulic, Light, 7 1/2 Ton Page Navigation
  454    455    456    457    458  459  460    461    462    463    464  
img
. .
TM 5-3810-305-23
0073
WARNING
Wear protective equipment while heating and handling bearing cone. Failure to follow this
warning may cause injury or death to personnel.
REMOVAL
NOTE
The following is a maintenance procedure for one work light. Maintenance procedure
for remaining two work lights is identical.
Tag all wire assemblies before disconnecting to aid in installation. Remove tags
following maintenance.
1.
Disconnect two wires (Figure 1, Item 3) from work light (Figure 1, Item 1).
2.
Remove nut (Figure 1, Item 4), lockwasher (Figure 1, Item 5), and work light (Figure 1, Item 1) from boom
(Figure 1, Item 2). Discard lockwasher.
END OF TASK
CLEANING
Clean parts IAW General Maintenance Instructions (WP 0162).
END OF TASK
INSPECTION
Inspect parts IAW General Maintenance Instructions (WP 0162).
END OF TASK
INSTALLATION
NOTE
Install wires as tagged during removal.
1.
Install work light (Figure 1, Item 1), new lockwasher (Figure 1, Item 5), and nut (Figure 1, Item 4) to boom
(Figure 1, Item 2).
2.
Connect two wires (Figure 1, Item 3) to work light (Figure 1, Item 1).
0073-2
03/15/2011Rel(1.8)root(maintwp)wpno(M00079)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.