Figure 1. Charge Pump Removal.
CONTROL VALVE MAINTENANCE

Technical Manual For Crane, Wheel Mounted, Hydraulic, Light, 7 1/2 Ton Page Navigation
  544    545    546    547    548  549  550    551    552    553    554  
img
. . .
TM 5-3810-305-23
0089
INSTALLATION
1.
Install charge pump (Figure 2, Item 1) on transmission main case (Figure 2, Item 4).
2.
Install four new lockwashers (Figure 2, Item 3) and capscrews (Figure 2, Item 2) on charge pump.
3.
Position hoses (Figure 2, Items 5 and 6) on charge pump (Figure 2, Item 1).
4.
Connect hoses (Figure 2, Items 5 and 6) to charge pump (Figure 2, Item 1) on top right side of transmission
main case (Figure 2, Item 4).
4
3
2
6
1
5
M2104105
Figure 2.
Charge Pump Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install deck plates (WP 0122).
2.
Connect battery cables (WP 0076).
3.
Place boom in resting position (TM 5-3810-305-10).
END OF TASK
END OF WORK PACKAGE