1.
Install two bosses (Figure 6, Item 6) and grille guards (Figure 6, Item 9) on engine hood (Figure 6, Item 5).
2.
Install two washers (Figure 6, Item 7) and new locknuts (Figure 6, Item 8).
3.
Install two capscrews (Figure 6, Item 10), washers (Figure 6, Item 11), grille guard (Figure 6, Item 9), and two
bosses (Figure 6, Item 6).
4.
Install two washers (Figure 6, Item 3), washers (Figure 6, Item 2), and new locknuts (Figure 6, Item 1).
4
5
1,2,3
11
6
10
7
9
8
M0582105
Figure 6.
Grille Guard Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Place boom in resting position (TM 5-3810-305-10).
2.
Check for proper operation.
END OF TASK
END OF WORK PACKAGE