• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Hood Support Installation.
HOOD SUPPORT MAINTENANCE - Continued

Technical Manual For Crane, Wheel Mounted, Hydraulic, Light, 7 1/2 Ton Page Navigation
  772    773    774    775    776  777  778    779    780    781    782  
img
.
TM 5-3810-305-23
0120
INSTALLATION - Continued
2.
Connect restriction indicator hose (Figure 3, Item 15) to restriction indicator (Figure 3, Item 14).
3.
Install stack cap (Figure 3, Item 5), 90 degree elbow (Figure 3, Item 8), and T-bolt clamp (Figure 3, Item 9) as
an assembly and tighten nut (Figure 3, Item 10) on T-bolt clamp.
4.
Install U-bolt (Figure 3, Item 7) and two new locknuts (Figure 3, Item 6) on hood support.
5.
Install two clamps (Figure 3, Item 2), spacer (Figure 3, Item 3), plate (Figure 3, Item 1), capscrew
(Figure 3, Item 4), and nut (Figure 3, Item 13) on hoses (Figure 3, Items 11 and 12).
23
1
4
5
13
12
6
15
11
7
14
8
10
9
M0581105
Figure 3. Hood Support Installation.
END OF TASK
0120-4
03/15/2011Rel(1.8)root(maintwp)wpno(M00133)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.