TM 5-3810-305-23
0135
INSTALLATION - Continued
10.
Install six new o-rings (Figure 11, Item 4) and adapters (Figure 11, Item 3) to bottom of manifold
(Figure 11, Item 1), as recorded.
11.
Connect six hoses (Figure 11, Item 2) to bottom of manifold (Figure 11, Item 1).
12.
Close dipstick cap.
13.
14.
Remove lifting device from boom.
1
2
4
3
M0454105
Figure 11. Rotary Manifold Installation.
END OF TASK
03/15/2011Rel(1.8)root(maintwp)wpno(M00151)