• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Outrigger Solenoid Valve Disassembly.
Figure 7. Outrigger Solenoid Valve Assembly.

Technical Manual For Crane, Wheel Mounted, Hydraulic, Light, 7 1/2 Ton Page Navigation
  913    914    915    916    917  918  919    920    921    922    923  
img
. . .
TM 5-3810-305-23
0136
DISASSEMBLY - Continued
7.
Remove two brackets (Figure 6, Item 3), if damaged, remove two capscrews (Figure 6, Item 2),
nuts (Figure 6, Item 4), and brackets (Figure 6, Item 3) from body.
END OF TASK
CLEANING
Clean parts IAW General Maintenance Instructions (WP 0162).
END OF TASK
INSPECTION
Inspect parts IAW General Maintenance Instructions (WP 0162).
END OF TASK
ASSEMBLY
1.
If removed, install two brackets (Figure 6, Item 3), two capscrews (Figure 6, Item 2), and nuts
(Figure 6, Item 4) to body (Figure 6, Item 1).
2
1
3
3
4
M0107105
Figure 6. Outrigger Solenoid Valve Assembly.
0136-6
03/15/2011Rel(1.8)root(maintwp)wpno(M00152)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.