TM 5-3810-306-20TRANSMISSION SHIFT HYDRAULIC LINES, SUPERSTRUCTURETOOLS: General mechanic’s tool kit: automotive (5180-00-177-7033)SUPPLIES:Loctite 545 (Item 13, Appendix C)Preformed packings as requiredEQUIPMENT CONDITIONS: Disconnect ground cable at shunt. (Refer to page 8-109.)REMOVAL:NOTEUse the following pro cedure to replaceall cedure to replace all hydraulic lines.1.REMOVE HYDRAULIC LINE.a.Tag and disconnect both ends of hydraulic line.Remove line and preformed packing. Noterouting for ease in installation.b.Remove fittings and preformed packing asnecessary. Discard preformed packing.c.Inspect all parts for damage and replace asrequired.INSTALLATION:1.INSTALL HYDRAULIC LINE.a.Coat threads with Loctite 545 and preformedpackings with clean hydraulic fluid prior toinstallation.b.Install fittings and new preformed packing.Tighten securely.c.Route hydraulic line and connect both ends withnew preformed packing. Tighten securely.2.CONNECT GROUND CABLE AT SHUNT. (REFERTO PAGE 8-109.)3.START ENGINE AND CHECK TRANSMISSIONSHIFT FUNCTIONS. CHECK FOR LEAKS.(REFER TO TM 5-3810-306-10.).END OF TASK9-4
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business