TM 5-3810-306-20AIR LINES REPLACEMENT, SUPERSTRUCTURE AND CARRIERTOOLS: General mechanic’s tool kit: automotive (5180-00-177-7033)SUPPLIES:Loctite #545 (Item 13, Appendix C)EQUIPMENT CONDITIONS: Disconnect ground cable at shunt. (Refer to page 8-109.)REMOVAL:NOTEUse the following procedure toreplace all air lines.1.REMOVE AIR LINE.a.Tag and disconnect both ends of air line.Remove line and note routing for ease ininstallation.b.Remove fittings as necessary.c.Inspect all parts for damage and replace asrequired.INSTALLATION:1.INSTALL AIR LINE.a.Coat threads with Loctite 545 prior to installation.b.Install fittings and tighten securely.c.Route air line and connect both ends. Tightensecurely.2.CONNECT GROUND CABLE AT SHUNT. (REFERTO PAGE 8-109.)3.START ENGINE AND CHECK ALL AIR SYSTEMFUNCTIONS. CHECK FOR LEAKS. (REFER TOTM 5-3810-306-10.)END OF TASK11-42
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business