TM 5-3810-307-24-1-1
Organizational Preventive Maintenance Checks and Services
(2)
(1)
(3)
(4)
(5)
Interval
Item
Item To Be
Equipment Is Not
M
Q
S
A
B
H
No.
Inspected
Procedure
Ready/Available If:
(1)
50
Cold Start System [If a. Check contents of
Improper operation, any
temperature is
fluid cylinder.
component damaged or
below 30F (-1C)]
clogged, fluid cylinder
b. Inspect valve
empty, or leaks detected.
assembly for
cleanliness and
damage.
c. Inspect tubing and
nozzles for
cleanliness, loose
connections, and
other damage.
d. Inspect wiring and
connectors for
security and damage.
e. Test system
operation.
(2)
Wheel Lug Nuts
Lug nuts loose.
[435 lbs-ft (590 Nm)]
(2a)
40
Clamshell and/or
Check all attaching
Any attaching hardware
Grapple
hardware for
damage/missing/loose.
damage/security.
(2b)
Engine Coolant
Startup and run engine
Engine coolant heater
Heater (If Installed)
coolant heater for fifteen
inoperative (cold weather
minutes.
operation only).
(3)
Lubrication
Perform Lubrication Chart
requirements.
(4)
200
Electric Swivel
a. Check collector ring
a. Collector ring and
and brush assembly
brush assembly
for corrosion, pitting,
corroded, pitted,
arcing, and wear.
worn, or shows signs
of arcing.
b. Check that collector
b. Setscrews loose.
ring setscrews are
tight.
c. Check that brush and c. Spring tension weak.
arm assembly springs
are holding brushes
firmly against collector
rings.