TM 5-3810-307-24-1-1
ii.
Connect engine/transmission electrical harness connector and four ground wires at front left side of engine
on carrier frame crossmember.
jj.
Install radiator, refer to Radiator and Air Cooler Installation procedures.
kk.
Service hydraulic tank, refer to Lubrication Chart.
ll.
Service transmission, refer to Lubrication Chart.
mm. Close drain valves on secondary and auxiliary air tanks.
nn.
Connect drive lines to transmission, refer to Drive Lines Installation procedures.
oo.
Start crane and check for leaks and proper operation.
pp.
Shutdown crane and service oil levels as necessary.
qq.
Install engine hood, refer to Engine Hood Installation procedures.
rr.
Install deck plate over transmission.
ss.
Start crane, position boom back onto boom rest, and shutdown crane.
2-2-11