• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure J-8. Hydraulic Reservoir Heater Element Installation
Figure J-10. Seven Day Timer Installation

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 1 - Pt2 Page Navigation
  599    600    601    602    603  604  605    606    607    608    609  
img
. . . .
TM 5-3810-307-24-1-2
Half Moon Notch
Cut In Bracket
Figure J-9. Hydraulic Reservoir Bracket Modification (If Necessary)
Seven Day Timer Installation. (Refer To Figure J-10.) Install the seven day timer on the dash panel
in the carrier cab as follows:
a.
Place wedge bezel (1, Figure J-10) and mounting bracket (2) - P/N 22 1000 50 01 00 on
top right hand corner of dash panel and align to face the operating seat at a slight angle
(to avoid dash panel lights underneath). Refer to Figure J-10.
CAUTION
Ensure mounting holes will not interfere with the dash panel lights on front
underside of the dash panel prior to drilling holes.
b.
Mark locations for four mounting holes.
CAUTION
To avoid unnecessary damage, do not allow drill bit to penetrate too deep
into the dash during drilling.
c.
Drill four 1/8" holes in top of dash panel.
d.
Position wedge bezel (1) on dash panel so that mounting bracket (2) has a slight upward
angle, position the mounting bracket (2) on top, and align the holes.
J-18 Change-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.