• Google+Share on Google+
    • FacebookShare on Facebook
    • LinkedInShare on LinkedIn
    • TwitterShare on Twitter
    • DiggShare on Digg
    • StumbleUponShare on StumbleUpon
    • Home
    • Download PDF
    • Order CD-ROM
    • Order in Print
    Figure J-9. Hydraulic Reservoir Bracket Modification (If Necessary)
    Fuel Metering Pump Installation

    Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 1 - Pt2 Page Navigation
      600    601    602    603    604  605  606    607    608    609    610  
    img
    .
    TM 5-3810-307-24-1-2
    e.
    Secure the wedge bezel (1) and mounting bracket (2) - P/N 22 1000 50 01 00 to the
    dash panel with four self-tapping screws (3) (not included in kit).
    f.
    Ensure the 24V bulb (green bulb casing) is installed in the seven day timer - P/N 22
    1000 30 36 00 (4) and slide the seven day timer into the mounting bracket assembly.
    3
    2
    7
    4
    8
    6
    5
    1
    DASH PANEL LAMP
    (UNDER DASH PANEL)
    PLASTIC PLUG
    IN ACCESS HOLE
    DASH PANEL
    LEGEND
    1.
    Wedge Bezel
    5.
    Wiring Cable
    2.
    Mounting Bracket
    6.
    Jumper Wire
    3.
    Self-tapping Screws
    7.
    Terminal
    4.
    Seven Day Timer
    8.
    Connector Body
    Figure J-10. Seven Day Timer Installation
    Change-1 J-19


    Privacy Statement
    Press Release
    Contact

    © Copyright Integrated Publishing, Inc.. All Rights Reserved.