• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Timing Pin - Installation (0-78)
Timing Pin - Installation (0-78) - Continued

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 2 - Pt2 Page Navigation
  67    68    69    70    71  72  73    74    75    76    77  
img
TM 5-3810-307-24-2-2
15 mm
Use two flywheel housing capscrews to assemble the
plate over Cylinder Number 1.
Rotate the crankshaft until the piston contacts the plate.
Mark the pulley.
Rotate the engine in the opposite direction until the
piston contacts the plate.
Mark the pulley.
Mark the pulley for TDC which is one-half the distance
between the first two marks.
0-53 C-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.