• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
P7100 Injection Pump Installation
P7100 Injection Pump Installation - Continued

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 2 - Pt2 Page Navigation
  78    79    80    81    82  83  84    85    86    87    88  
img
TM 5-3810-307-24-2-2
Remove the timing pin.
If the timing tooth is not aligned with the timing pin
hole, rotate the pump shaft until the timing tooth
aligns.
Reverse the position of the pin so the slot of the pin
will fit over the timing tooth in the pump.
Install and secure the pin with the access plug.
Use a 50/50 mixture of clean engine oil and STP
or equivalent to lubricate the gear cover housing to
ensure the injection pump will slide into the
housing easily.
0-64 C-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.