• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
P7100 Injection Pump Installation - Continued
P7100 Injection Pump Installation - Continued

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 2 - Pt2 Page Navigation
  80    81    82    83    84  85  86    87    88    89    90  
img
TM 5-3810-307-24-2-2
30 mm
Install the retaining nut and washer.
Torque Value: 15 Nm
[11 ft-lb]
To prevent damage to the timing pins, do not
exceed the torque value given. This is not the final
torque value for the retaining nut.
Disengage the engine timing pin.
24 mm
Remove the fuel pump timing pin plug, Reverse the
position of the pin and install the pin, plug, and
sealing washer.
Torque Value: 15 Nm
[11 ft-lb]
30 mm
Tighten the fuel pump drive nut.
Torque Value: 165 Nm
[122 ft-lb]
Install the gear cover access cap hand tight.
0-66 C-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.