• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Locked Timed Injection Pump - Installation - Continued
P7100 Injection Pump Installation - Continued

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 2 - Pt2 Page Navigation
  77    78    79    80    81  82  83    84    85    86    87  
img
.
TM 5-3810-307-24-2-2
P7100 Injection Pump Installation
Make sure the engine has Cylinder No. 1 at TDC.
The injection pump also has a timing pin (1), located in
the governor housing, to position the pump shaft to
correspond with TDC for Cylinder No. 1. The pin is to
be reversed and stored in the housing (2) after the
pump is installed.
24 mm
Remove the access plug.
0-63 C-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.