• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
P7100 Injection Pump Installation - Continued
P7100 Injection Pump Installation - Continued

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 2 - Pt2 Page Navigation
  79    80    81    82    83  84  85    86    87    88    89  
img
TM 5-3810-307-24-2-2
Also lubricate the mounting flange of the injection pump.
CAUTION
The fuel pump drive gear inside diameter and
the shaft outside diameter must be clean and
dry before installing the shaft into the gear. A
non-petroleum based cleaner should be used
to clean the drive gear and shaft mounting
surfaces. Failure to do so will result in gear
slippage in the retarded direction.
NOTE
If the mounting flange O-ring has a colored
stripe, it can not be reused. Replace with a
new O-ring. Furthermore, do not lubricate the
new type O-ring. Instead, lubricate the
seating area of the gear housing.
NOTE
The P7100 fuel injection pump driveshaft has
a provision for a Woodruff key, however, it is
not required. Timing mark alignment is not
required for the P7100 drive gear.
Slide the pump shaft through the drive gear and position
the pump flange onto the mounting studs.
Push the pump forward until the mounting flange and o-
ring are properly fitted into the gear housing bore.
CAUTION
Do not attempt to pull the pump flange into
the gear housing with the mounting nuts as
damage to housing will occur.
15 mm
Install the mounting nuts.
Torque Value: 43 Nm
[32 ft-lb]
0-65 C-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.