• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Front Cover - Installation (0-98)
Push Rods - Installation (0-100)

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 2 - Pt2 Page Navigation
  85    86    87    88    89  90  91    92    93    94    95  
img
.
TM 5-3810-307-24-2-2
Apply a thin bead of compound (NSN 8030-00-252-
3391) to the cover side of the front cover gasket only.
NOTE
Do not remove the plastic seal pilot tool from
the lubricating oil seal at this time. Use the
plastic seal pilot tool to guide the seal on the
crankshaft.
Install the gasket and front cover on the engine.
10 mm
Remove the alignment/installation tool after tightening
the capscrews.
Torque Value: 24 Nm
[18 ft-lb]
Install the front cover access cap and seal.
Cylinder Head - Installation (0-99)
CAUTION
Make sure the cylinder head and block
surface are clean and not nicked or gouged.
Mallet
If removed, install the two cylinder head dowels. Drive
the dowels to the bottom of the dowel bore.
0-71 C-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.