Figure 151. Transfer case levers, and control rods, removal and installation.
Section XXVII. CARRIER FRAME
247. General
248. Pintle Hook
The carrier frame is a welded-steel structure with
a. Removal and Disassembly.
Remove and
crossmembers, supporting brackets, and front outrigger
disassemble the pintle hook in the numerical sequence
frame welded integrally with the frame. The rear
outrigger assembly is mounted at the back of the frame
b. Cleaning, Inspection, and Repair.
and is removable. The carrier frame supports and
(1) Clean all parts with an approved cleaning
carries the crane and all components. A pintle hook is
solvent.
mounted on the rear outrigger assembly for towing
(2) Inspect all parts for defective conditions.
purposes.
(3) Repair or replace damaged parts as
necessary.
AGO 6819A
170