b. Installation.
(4) Disconnect the fuel line (TM 5-3810-232-
12).
(1) Install the crane cab assembly as
(5) Disconnect the cab heater (TM 5-3810-
232-12).
(2) Connect the control panel instruments and
(6) Disconnect the throttle linkage (TM 5-
engine controls (TM 5-3810-232-12).
3810-232-12).
(3) Install the crane boom attachment as
(7) Disconnect the master clutch linkage (TM
necessary (TM 5-3810-232-12).
5-3810-232-12).
(8) Remove the main drive chain case cover
2-9. Crane Engine Assembly
and chain (TM 5-3810-232-12).
a. Remove.
(9) Remove bolt, lockwasher, and retaining
ring, then using a gear pulley pull the drive gear from the
clutch shaft.
NOTE
(10) Remove chain case plate, nuts, bolts and
Rear portion of roof and right side
washers. Remove the inner and outer chain case plates.
only need be removed to remove
(11) Remove the engine wiring harness (para
engine assembly.
3-14).
(2) Drain the cooling system.
(13) Remove the crane engine assembly as
(3) Disconnect the battery cables.
2-8