TM 5-3810-294-34
which attachment is installed, as instructed in TM -3810-
2-11.
Cab Assembly
294-10.
a. Removal.
2-12. Gantry Assembly
(1) Unreeve boom hoist and load lines.
a. Removal.
Refer to TM 5-3810-294-10.
(1) Remove front end attachment. Refer
to TM 5-3810-294-10.
metal as required to remove the component,
b. Installation.
(2) Remove boom backstops. Refer to TM
5-3810-294-10.
metal removed during major component removal
metal as required.
(2) Install front end attachment. Refer to
TM 5-3810-294-10.
gantry.
(3) Reeve the applicable lines, depending
on
Figure 2-2. Gantry assembly, removal and installation.
b. Installation.
2-13.
Engine and Transmission Assembly
a. General. Because the engine and
cotter pins removed during gantry removal.
transmission assembly (fig. 2-3) is difficult to separate or
remove except as a single assembly, it is removed and
metal as required.
installed as a unit. The unit includes the radiator, engine,
(3) Install boom or other front end
air cleaner, and transmission.
attachment, install backstops, and install boom hoist and
load lines (TM 5-3810-294-10).
2-20