(53) and rubber grommet (54). Remove left panel (55)
TM 5-3810-295-34
and right panel (56) from instrument panel (63).
13-47.
Cleaning, Inspection and Repair
removed in disassembly.
a. Clean all parts using cleaning solvent (Federal
(6) Install new warning plate (23) if necessary. In-
Specification P-D-680, or equivalent) and dry
stall speedometer (24), pressure indicator (25), tem-
thoroughly.
perature indicator (26) and voltage regulator (27).
b. Inspect all parts for defects or damage. Check
(7) Install toggle switch (22) into panel (55) and
panel for cracks or breaks.
secure with screws (21).
c. Repair or replace all defective parts. Replace all
(8) Install light indicator socket (17), lamp (18),
excessively damaged data plates.
cable (19) and plugs (20).
d. Replace any cracked or dryed rubber grommets.
(9) Install light indicator socket (13) lamp (14) ca-
e. Replace all inoperative indicators.
ble (15) and plugs (16).
13-48. Reassembly and Installation
(10) Install circuit breaker (12) to control panel
a. Refer to figure 13-18 and reassemble the instru-
and secure with screws (11), lock washers (10) and
ment board assembly as follows:
nuts (9).
(1) Position left panel (55) and right panel (56) to
(11) Assemble switch base (3) and gasket (4) to
instrument panel (63) and install studs (52), rubber
starter switch (5). Secure starter switch cup and
grommets (54) and retaining clips (53).
plunger assembly (5) to control panel with nut (6), lock
(2) Install rotary switch lever (49) and rotary
washer (7) and nut (8).
switch (48) to the instrument panel.
(12) Install light switch (2) to control panel and
secure with screws (1).
fuel indicator (47), air gage (50), and temperature in-
b. Refer to TM 5-3810-295-12 and figure 13-18 and
dicator (51) if removed during disassembly.
install the control panel assembly in the carrier cab.
(4) Install rubber grommets (41 and 42) and
(1) Place instrument board in carrier cab and
mountings screws (43) and lock washers (44).
(5) Install new data plates (29-40) that were
screws (60), lock washers (61) and nuts (62).
(2) Connect all electrical leads as tagged in the
removal procedure.
13-36