• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 30. Power Pack Installation.
Figure 34. Power Pack Installation.

Technical Manual For Crane, Wheel Mounted, Hydraulic, Light, 7 1/2 Ton Page Navigation
  168    169    170    171    172  173  174    175    176    177    178  
img
.
TM 5-3810-305-23
0024
INSTALLATION - Continued
14.
Connect two hoses (Figure 32, Items 1 and 2) to main hydraulic pump (Figure 32, Item 3).
1
2
3
M0060105
Figure 32.
Power Pack Installation.
15.
Connect two hoses (Figure 33, Items 2 and 4) to charge pump (Figure 33, Item 3) on top right hand side of
transmission (Figure 33, Item 1).
2
1
3
4
M0059105
Figure 33.
Power Pack Installation.
0024-26
03/15/2011Rel(1.8)root(maintwp)wpno(M00029)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.