• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Flywheel Installation.
Figure 6. Flywheel Installation.

Technical Manual For Crane, Wheel Mounted, Hydraulic, Light, 7 1/2 Ton Page Navigation
  186    187    188    189    190  191  192    193    194    195    196  
img
.
TM 5-3810-305-23
0029
INSTALLATION - Continued
CAUTION
Dial indicator tip must not enter capscrew holes or gage will be damaged.
NOTE
Extension bar for dial indicator must be rigid for an accurate reading.
4.
Position dial indicator at 12 o'clock position. Adjust dial until needle points to zero.
5.
Slowly rotate crankshaft. Record readings obtained at 3 o'clock, 6 o'clock, and 9 o'clock positions.
6.
Continue to rotate crankshaft back to 12 o'clock position. Check dial indicator to make sure needle points to
zero. Determine Total Indicator Reading (TIR).
EXAMPLE:
12 o'clock = 0.000 inch (0.00 mm)
3 o'clock = +0.003 inch (0.08 mm)
6 o'clock = -0.002 inch (0.05 mm)
9 o'clock = +0.003 inch (0.08 mm)
Equals TIR = 0.005 inch (0.13 mm)
M0220105
Figure 5. Flywheel Installation.
0029-4
03/15/2011Rel(1.8)root(maintwp)wpno(M00034)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.