TM 5-3810-305-23
0043
INSTALLATION - Continued
3.
Install four injector nozzles (Figure 4, Item 3) in cylinder head (Figure 4, Item 1).
4.
Hold injector body with adjustable wrench and tighten hold-down nut, making sure injector nozzle
(Figure 4, Item 3) does not rotate. Torque hold-down nut (Figure 4, Item 2) to 44 ft-lb (60 Nm).
2
1
3
M0289105
Figure 4.
Injector Nozzles Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
2.
3.
4.
Place boom in resting position (TM 5-3810-305-10).
5.
Run engine until normal operating temperature is reached (TM 5-3810-305-10).
END OF TASK
END OF WORK PACKAGE
03/15/2011Rel(1.8)root(maintwp)wpno(M00049)