Home
Download PDF
Order CD-ROM
Order in Print
Figure 1. Fuel Pressure Switch and Transducer Installation.
DASH PANEL GAGES AND SWITCHES MAINTENANCE
Technical Manual For Crane, Wheel Mounted, Hydraulic, Light, 7 1/2 Ton
Page Navigation
393
394
395
396
397
398
399
400
401
402
403
TM
5-3810-305-23
0065
FOLLOW-ON
MAINTENANCE
1.
Install
engine
hood
(WP
0118).
2.
Connect
battery
cables
(WP
0076).
3.
Place
boom
in
resting
position
(TM
5-3810-305-10).
END
OF
TASK
END
OF
WORK
PACKAGE
0065-4
03/15/2011Rel(1.8)root(maintwp)wpno(M00071)