TM 5-3810-305-23
0069
CLEANING
Clean parts IAW General Maintenance Instructions (WP 0162).
END OF TASK
INSPECTION
Inspect parts IAW General Maintenance Instructions (WP 0162).
END OF TASK
INSTALLATION
1.
Install horn (Figure 2, Item 4), washer (Figure 2, Item 3), and new locknut (Figure 2, Item 1) on stud
(Figure 2, Item 2).
2.
Connect electrical wires (Figure 2, Item 5) to horn (Figure 2, Item 4).
1,2,3
4
M0124105
5
Figure 2. Horn Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
2.
Place boom in resting position (TM 5-3810-305-10).
3.
Check for proper operation.
END OF TASK
END OF WORK PACKAGE
03/15/2011Rel(1.8)root(maintwp)wpno(M00075)