• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 13. Boom Wiring Harness Installation.
Figure 15. Boom Wiring Harness Installation.

Technical Manual For Crane, Wheel Mounted, Hydraulic, Light, 7 1/2 Ton Page Navigation
  511    512    513    514    515  516  517    518    519    520    521  
img
. .
TM 5-3810-305-23
0082
INSTALLATION - Continued
WARNING
DO NOT release cord as cable reel will pull harness rapidly. Rapidly moving harness may
result in serious injury or death if it hits personnel.
12.
Hold anti-two block BY-PASS switch and lower boom. Shut engine OFF.
13.
Disconnect battery cables (WP 0076).
14.
Install shoulder screw (Figure 14, Item 1), washer (Figure 14, Item 2), roller (Figure 14, Item 3), and nut
(Figure 14, Item 4) on roller bracket (Figure 14, Item 5). Repeat for other roller.
15.
Install roller bracket (Figure 14, Item 5), two new lockwashers (Figure 14, Item 7), and capscrews
(Figure 14, Item 6) on boom.
2
3
1
4
7
5
6
M0169105
Figure 14. Boom Wiring Harness Installation.
0082-13
03/15/2011Rel(1.8)root(maintwp)wpno(M00088)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.