TM 5-3810-305-23
0085
INSTALLATION - Continued
8
4
6
7
5
4
3
2
1
30
9
29
10
12
28
11
27
13
14
18
15
16
17
26
8
11
7
21
19
25
20
24 23
22
M0548105
Figure 2. Transmission Shift Controls Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
2.
3.
Place boom in resting position (TM 5-3810-305-10).
4.
Check for proper operation.
END OF TASK
END OF WORK PACKAGE
03/15/2011Rel(1.8)root(maintwp)wpno(M00092)