PIVOT AND SPINDLE ASSEMBLY MAINTENANCE - Continued
PIVOT BEARINGS (TYPE II) MAINTENANCE

Technical Manual For Crane, Wheel Mounted, Hydraulic, Light, 7 1/2 Ton Page Navigation
  610    611    612    613    614  615  616    617    618    619    620  
img
. . .
TM 5-3810-305-23
0097
INSTALLATION - Continued
1
2
5
3
5
4
1
M0303105
Figure 6. Pivot and Spindle Assembly Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install tires and wheels (WP 0107).
2.
Connect battery cables (WP 0076).
3.
Place boom in resting position (TM 5-3810-305-10).
4.
Check for proper operation.
END OF TASK
END OF WORK PACKAGE
0097-9/10 blank