TM 5-3810-305-23
0107
INSTALLATION - Continued
2.
Tighten 10 lug nuts (Figure 6, Item 1) to 450 to 500 ft-lb (610 to 678 Nm) in sequence.
3.
Remove jack stands.
4.
Raise outriggers or remove jack.
5.
Recheck after 8 hours of operation.
1
M0185105
Figure 6. Tires and Wheels Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
Place boom in resting position (TM 5-3810-305-10).
END OF TASK
END OF WORK PACKAGE
03/15/2011Rel(1.8)root(maintwp)wpno(M00119)