TM 5-3810-305-23
0108
INSPECTION
1.
Inspect parts IAW General Maintenance Instructions (WP 0162).
2.
Inspect dust shields (Figure 1, Item 5) for wear, tears, and deformation.
3.
Inspect all parts for wear, pitting, cracks, or corrosion. Replace if necessary.
END OF TASK
INSTALLATION
1.
Install grease fittings (Figure 2, Item 1) on tie rod ends (Figure 2, Item 6).
2.
Slide clamp assemblies (Figure 2, Item 7) onto tie rod (Figure 2, Item 8).
3.
Screw tie rod ends (Figure 2, Item 6) onto tie rod (Figure 2, Item 8), using measurement recorded in removal.
4.
Install dust shields (Figure 2, Item 5) on tie rod levers (Figure 2, Item 4).
5.
Install tie rod ends (Figure 2, Item 6) into tie rod levers (Figure 2, Item 4).
6.
Install tie rod end nuts (Figure 2, Item 2) on to tie rod ends (Figure 2, Item 6). Tighten tie rod end nuts
to 180 ft-lb (244 Nm) and advance to next castellation.
7.
Install new cotter pins (Figure 2, Item 3) on tie rod ends (Figure 2, Item 6).
8.
Secure clamp assemblies (Figure 2, Item 7).
1
2
8
3
6
7
M0186105
54
Figure 2. Tie Rod Assembly Installation.
END OF TASK
0108-3
03/15/2011Rel(1.8)root(maintwp)wpno(M00120)