TM 5-3810-305-23
FIELD MAINTENANCE
VALVE CONTROL, BOOM HOIST, EXTEND, AND WINCH CABLES MAINTENANCE
INITIAL SETUP:
Materials/Parts (cont.)
Tools and Special Tools
Washer, Lock M10 (WP 0172, Table 1, Item 129)
Tool Kit, General Mechanic's (WP 0171, Table 1,
Item 17)
Qty: 8
Qty: 4
Materials/Parts
Pin, Cotter (WP 0172, Table 1, Item 155) Qty: 3
Pin, Cotter (WP 0172, Table 1, Item 156) Qty: 4
References
Pin, Cotter (WP 0172, Table 1, Item 157) Qty: 1
Nut, Self-Locking (WP 0172, Table 1, Item 139)
Qty: 4
Equipment Condition
Boom in horizontal position and fully retracted (TM
Qty: 6
5-3810-305-10)
Outriggers lowered and fully retracted (TM
5-3810-305-10)
WARNING
Ensure to tag all cables and valve body properly before disconnecting. Failure to follow this
warning may result in injury or death to personnel.
0129-1
03/15/2011Rel(1.8)root(maintwp)wpno(M00145)