Figure 4. Swing and Outrigger Cable Removal.
Figure 5. Boom Hoist, Extend, and Winch Cable Removal.

Technical Manual For Crane, Wheel Mounted, Hydraulic, Light, 7 1/2 Ton Page Navigation
  851    852    853    854    855  856  857    858    859    860    861  
img
TM 5-3810-305-23
0129
REMOVAL - Continued
Boom Hoist, Extend, And Winch Cable
1.
Remove cotter pin (Figure 5, Item 2) and pin (Figure 5, Item 9) from clevis (Figure 5, Item 3).
Discard cotter pin.
NOTE
Clevis is not removed from disconnect assembly on winch cable. Disconnect assembly
and clevis are removed as an unit.
Use Steps 3, 4, 5, and 6 for winch cable removal.
2.
Remove capscrew (Figure 5, Item 1) and clevis (Figure 5, Item 3) from disconnect assembly
(Figure 5, Item 8).
NOTE
Tag all wire assemblies before disconnecting to aid in installation. Remove tags
following maintenance.
3.
Disconnect two wires from disconnect assembly (Figure 5, Item 8).
4.
Loosen jam nut (Figure 5, Item 10) and remove disconnect assembly (Figure 5, Item 8) from vehicle.
5.
Remove jam nut (Figure 5, Item 10) from cable (Figure 5, Item 5).
6.
Loosen two locking nuts (Figure 5, Item 4) and lift cable assembly (Figure 5, Item 5) from bracket
(Figure 5, Item 6). Remove locking nuts and washers (Figure 5, Item 7) from cable.
7.
Remove cable (Figure 5, Item 5) from carrier.
0129-6