• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Valve Control Cable Removal.
Boom Hoist, Extend, And Winch Cable

Technical Manual For Crane, Wheel Mounted, Hydraulic, Light, 7 1/2 Ton Page Navigation
  850    851    852    853    854  855  856    857    858    859    860  
img
.
TM 5-3810-305-23
0129
REMOVAL - Continued
Swing And Outrigger Cable
NOTE
The valve end of boom hoist, extend and winch cables are different from outrigger and swing
cable. The end of each cable group must be removed using the correct procedure.
1.
Remove cotter pin (Figure 4, Item 2) and pin (Figure 4, Item 10) from clevis (Figure 4, Item 9).
Discard cotter pin.
2.
Remove two jam nuts (Figure 4, Item 1) and clevis (Figure 4, Item 9).
3.
Loosen two locking nuts (Figure 4, Item 3) and pull cable from bracket.
4.
Remove two locking nuts (Figure 4, Item 5) and washers (Figure 4, Items 6 and 8) from clamps
(Figure 4, Item 7).
5.
Carefully pull cable (Figure 4, Item 4) out of vehicle.
1
2
1
10
9
3
4
5
6
7
8
M0561105
Figure 4.
Swing and Outrigger Cable Removal.
0129-5
03/15/2011Rel(1.8)root(maintwp)wpno(M00145)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.