• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4. Boom Assembly Removal.
Figure 6. Boom Assembly Disassembly.

Technical Manual For Crane, Wheel Mounted, Hydraulic, Light, 7 1/2 Ton Page Navigation
  1061    1062    1063    1064    1065  1066  1067    1068    1069    1070    1071  
img
.
TM 5-3810-305-23
0156
REMOVAL - Continued
13.
Start engine. Retract boom hoist cylinder rod by pushing boom hoist lever and holding anti-two block BY-PASS
switch. Cylinder rod must clear attachment point on boom. Shut engine OFF (TM 5-3810-305-10).
NOTE
Record number of shims during removal to aid in installation.
14.
Remove capscrew (Figure 5, Item 1), lockwasher (Figure 5, Item 6), rod (Figure 5, Item 4), boom base pin
(Figure 5, Item 3), and shims (Figure 5, Item 2). Discard lockwasher.
15.
Lift boom (Figure 5, Item 5) off carrier with lifting device and lower onto support.
2
1
3
4
6
5
M0619105
Figure 5. Boom Assembly Removal.
END OF TASK
0156-6
03/15/2011Rel(1.8)root(maintwp)wpno(M00172)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.