TM 5-3810-305-23
FIELD MAINTENANCE
BOOM ASSEMBLY MAINTENANCE
INITIAL SETUP:
Materials/Parts (cont.)
Tools and Special Tools
Washer, Lock 24M (WP 0172, Table 1, Item 128)
Tool Kit, General Mechanic's (WP 0171, Table 1,
Item 17)
Qty: 2
Suitable Lifting Device, 5,000-lb (2,268 kgs)
Washer, Lock M10 (WP 0172, Table 1, Item 129)
Minimum Capacity
Qty: 1
Materials/Parts
Personnel Required
Cap Set, Protective Dust and Moisture Seal
(Two)
References
TM 5-3810-305-10
Item 135) Qty: 2
O-Ring Qty: 2
Equipment Condition
Boom in horizontal position and fully retracted (TM
5-3810-305-10)
0156-1
03/15/2011Rel(1.8)root(maintwp)wpno(M00172)