INSTALLATION - Continued
2.
Align boom (Figure 29, Item 5) so that pivot holes match pivot holes in upperstructure. Install shims
(Figure 29, Item 2), boom base pin (Figure 29, Item 3), rod (Figure 29, Item 4), new lockwasher
(Figure 29, Item 6), and capscrew (Figure 29, Item 1).
2
1
3
4
6
5
M0619105
Figure 29. Boom Assembly Installation.
WARNING
Weight of boom hoist cylinder is approximately 507 lb (230 kg). Use adequate lifting
equipment to lift and support boom hoist cylinder. DO NOT lift over personnel or let personnel
walk underneath suspended load. Failure to follow this warning may cause injury or death to
personnel.
3.
Start engine. Extend boom hoist cylinder rod by pulling boom hoist lever. Align rod end with attachment point
on boom. Shut engine OFF (TM 5-3810-305-10).
4.
Install pin (Figure 30, Item 5), rod (Figure 30, Item 4), new lockwasher (Figure 30, Item 2), and capscrew
(Figure 30, Item 1) on boom hoist cylinder (Figure 30, Item 3).
0156-24