BOOM ASSEMBLY MAINTENANCE - Continued
UPPERSTRUCTURE MAINTENANCE

Technical Manual For Crane, Wheel Mounted, Hydraulic, Light, 7 1/2 Ton Page Navigation
  1084    1085    1086    1087    1088  1089  1090    1091    1092    1093    1094  
img
. . .
TM 5-3810-305-23
0157
FIELD MAINTENANCE
BOOM WORK LIGHT BRACKET MAINTENANCE
INITIAL SETUP:
Tools and Special Tools
Materials/Parts
Tool Kit, General Mechanic's (WP 0171, Table 1,
Washer, Lock M10 Qty:
1
Item 17)
REMOVAL
Remove a capscrew (Figure 1, Item 1), lockwasher (Figure 1, Item 2) and bracket (Figure 1, Item 3).
Discard lockwasher.
END OF TASK
INSTALLATION
Install bracket (Figure 1, Item 3), new lockwasher (Figure 1, Item 2) and capscrew (Figure 1, Item 1).
3
2
1
M2110105
Figure 1.
Bracket Maintenance.
END OF TASK
END OF WORK PACKAGE
0157-1/2 blank